SEA CONTAINER GROUP
  • en
    • Romana
  • ro en
    facebook [#176] Created with Sketch.
    Înapoi

    New acquisition

    28 noiembrie, 2024

    The Liebherr LHM420 Harbour Mobile Crane has arrived in the SCS terminal and is fully functional. With a load capacity of 124 tons,this crane is a versatile machine efficient for bulk and general cargo, which will significantly boost our handling capabilities. This purchase was a result with a contract signed with The Ministry of Transport and Infrastructure and financed as part of Transport Program 2021-2027.

    Stiri asemanatoare

    LATEST PURCHASES

    LATEST PURCHASES

    The two N.C.Nielsen NCN85 reach stackers have finally arrived.

    Sea Container Services has become the majority shareholder at Santierul Naval Orsova (Orsova Shipyard)

    Sea Container Services has become the majority shareholder at Santierul Naval Orsova (Orsova Shipyard)

    through the recent acquisition in the Bucharest Stock Exchange system of the majority stake.

    GAS PIPELINE PROJECT

    GAS PIPELINE PROJECT

    First lot of pipes from the Tuzla – Podisor gas pipeline has been discharged in the SCS terminal.

    logo_no_bg.webp
    • ABOUT US
    • SERVICES
    • GALLERY
    • CONTACT US
    • REQUEST OFFER

    © Copywrite SEA CONTAINER SERVICES. Powered by SpyMedia.

    • Privacy policy
    facebook [#176] Created with Sketch. linkedin [#161] Created with Sketch.
    Acest site folosește cookies. Navigand in continuare, iti exprimi acordul.